G+5+R RESIDENTIAL BUILDING, EWAN BUILDING @ DIP MEP WORKS “The Edge – Ewan Residences “

 LOCATION: DIP – DUBAI, UAE
CLIENT: M/S. LOOTAH REAL ESTATE DEVELOPMENT
CONSULTANT: STUDIO INT’L ENGINEERING CONSULTANCY.
CONTRACTOR: AL HAZAMI BUILDING CONTRACTING CO. 

SCOPE OF WORKS:

HVAC:

  • Supply & Install CHW DC FCU’s & FAHU along with supports.
  • Supply & Install Phenolic Duct, GI duct & Fire rated duct along with supports.
  • Supply & Install Smoke management system as per DCD regulation

ELECTRICAL.:

  • Supply & Install power cables & wires to termination points as per DEWA regulation.
  • Supply & Install switchgear panels, cabling & wiring as per DEWA regulation.
  • Supply & Install LV panel along with cabling and connection.

PLUMBING:

  • Supply & Install uPVC, PPR pipes along with fittings as per DM regulation.
  • Supply & Install pipes Valves, isolating valves, hose bib, NRV along with accessories.
  • Supply & Install water transfer pump set (duty+Stand by) along with fittings.

GAS SYSTEM:

  • Supply & Install Gas pipe system along with fittings and valves.