Al Adel School – Al Ain

LOCATION: UAE
CLIENT: MUSANADA / AL FALAH HOLDING.
CONTRACTOR: UNITED ENGINEERING & TRADING CO, LG
CONSULTANTS: PIONEER ENGINEERING CONSULTANCY.

Al Adel School re-constructed project under Musanada & (Ministry of Education) supervision, the school ventilated in one of the most modern and environmental HVAC system, we use LG VRF System with fresh air units, it contains stage from KG1 up to 12 grades, with sporting hall, and huge theater. The work done in record time before the new studying year start, that needs to work day/night shifts. The school re-ventilated with new A/C system.Pre-insulated about 19,000 Sqft, GI Duct around 18,000 Sqft has been installed. Completing all plumping water supply PPR & PEX lines for bathrooms and WC also fixing booster pumps, sanitary ware and mirrors.

 

SCOPE OF WORKS:

  • Supply & Install Pre-insulated duct installation along with support & sound liner.
  • Supply & Install GI rectangle duct installation with fiber glass insulation, cloth & canvas
  • Supply & Install Fresh air duct installation along with aluminum cladding for duct.
  • Supply & Install booster pumps along with valves and fittings.
  • Supply & PPR & PEX pipes for bathrooms and WC.
  • Installing sanitary ware for all wet areas.