LOCATION: PLOT NO 9267, AL SUYAH SUBURB, SHARJAH
CLIENT: M/S. ARADA
CONSULTANT: M/S. ARIF AND BINTOAK LLC
CONTRACTOR: M/S. AL SERH AL KABEER CONSTRUCTION LLC
SCOPE OF WORKS:
SUPPLY & INSTALL THE PROJECT AS PER TENDER DRAWINGS, SPECIFICATIONS, AND VENDOR LIST OR EQUIVALENT ALONG WITH AUTHORITY REGULATION.
HVAC SYSTEM WITH TOTAL KW (520 KW)
- Supply & Install Packaged units / split ducted DX cooling ony 3 speeds along with supports.
- Supply & Install VRF split ducted cooling only 3 speeds along with supports
- Supply & Install VRF FAHU with heat recovery wheel and MERV 13 filters.
- Supply & Install Duct as per SMACNA for horizontal lines along with support.
- Supply & install Air outlet distribution powder coating Std color only (9010-9016).
- Supply & Install Digital thermostat and control wire as required.
- Supply & Install drain pipes to nearest drainage point with 6mm insulation.
- Water Pressure leakage test, flushing and termination.